SSM (former SKI) - Experiences from the International Common Cause Failure Data Exchange-project (ICDE)
Within the ICDE project a great amount of information on dependent failure, of CCF-character, at the nuclear power plants of the member countries has, during a long time, been collected and quality assured. It is considered to be important that the public reporting by ICDE is further treated at national and local level, in this case within SKI. Considering SKI it is essential that the collected information is modified so that the inspection activities can make use of and be supported by the obtained experiences when an inspection or review is planned and performed. The result is documented in SKI-rapport 2008:32 (written in swedish but with a short english summary).

Sandra Lindberg
sandra.lindberg(a)eskonsult.se
+46 (0)73 996 33 12


Ringhals AB - Modernization project Ringhals 1
During the modernization of old power plants the safety analysis reports are updated due to the introduced improvements. An important document that is included in the updating process is Säkerhets-tekniska driftförutsättningar. Following these operating conditions ensures that the plant is running within the parameters which the analyses are based on.

Mats Sjöberg
Mats.sjoberg(a)eskonsult.se
+46 (0)70 643 82 24



South Ukraine block 1, Ukraine – Support to the power plant during production of Periodic Safety Review, PSR
In accordance to Sweden's cooperation agreement with Ukraine SSM is supporting South Ukraine’s staff during the production of the plant's first PSR. IAEA is recommending that a PSR of a nuclear power plant is produced every 10 year. A PSR includes a number of keys being reviewed and analysed to ensure that the plant can operate until the next PSR, 10 years a head.

Mats Sjöberg
Mats.sjoberg(a)eskonsult.se
+46 (0)70 643 82 24



OKG AB - Projekt PULS – Updating system descriptions
An important part of power uprate projects is to update the safety analysis report which among many includes system descriptions. To manage the administration and the quality assurance of the work, we have used our own document management system (SusiQ) for creating a project site on our homepage. This means that we have traceability to all actions carried out and all the members in the project have easy access to the material.

Gunnar Johanson
gunnar.johanson(a)eskonsult.se
+46 (0)70 742 14 57



Forsmark AB – Staffing analyses

To be able SKI to assess the staffing in the control rooms for SKI, they have made an injuction to Sweden's nuclear power plants regarding staffing analyses for control room staff and plant technicians. The objective of the analyses is to study the staffing in a reactor safety point of view. Our project includes implemention, documentation and presentation of the analyses regarding the demand of control room staff and plant technicians which will be used when determining the minimum amount of staff.

Stefan Mattsson
stefan.mattsson(a)eskonsult.se
+46 (0)70 396 77 63



Forsmark AB – Surveillance central
As a result of the new requirements regarding the physical protection, an analysis of the work in the surveillance central has been carried out where the interaction between humans, technology and organistion is in focus.

Stefan Mattsson
stefan.mattsson(a)eskonsult.se
+46 (0)70 396 77 63



SKB AB – Transport of capsules
SKB is about to apply for a permit according to the Environmental Code to build and operate a final repository for spent nuclear fuel. This includes making an environmental impact assessment. Our project resulted in a description of the transport of capsules filled with spent nuclear fuel which will be a part of SKB's environmental impact assessment.

Peter Karnik
peter.karnik(a)eskonsult.se
+46 (0)70 743 97 81


 




 
Services
Safety analyses
Human Factors
Safety analysis reports
Education
Project management
About ES-konsult
Links
Client’s opinions
Marketing
References


Work for us
Vacancies
Words from ceo
Project
NAFCS/NPSAG »
ICDE »
Relap 5 »
NBSG »
LISA »
VATESI »
REA »
PULS »
PSR SUNPP
ESKIL
Contact
STOCKHOLM
Svetsarvägen 7
SE-171 41 Solna
Tel +46 8 634 22 40
Fax +46 8 634 22 55

GOTHENBURG
Vädursgatan 6
SE-412 50 Gothenburg
Tel +46 8 634 22 40